Network cabling costs depend on the number of data points, cable category (Cat6 is common), distances and routes, whether cables run in ceilings, walls or trunking, the rack and patch panel, testing and labelling, and the condition of the building. We survey and quote in writing, itemising materials and labour.
Key takeaways
- Number of points and total cable length drive the quote.
- Cat6 is a safe standard for most new work.
- Hard routes, such as concrete, cost more.
- Racks, patch panels and labelling add to the total.
- Testing and certification confirm quality.
01What moves the price
| Factor | Effect |
|---|---|
| Number of points | More outlets mean more cable and labour |
| Cable type | Cat5e, Cat6 or Cat6A; Cat6 is common |
| Distances | Longer runs use more cable and time |
| Routes | Ceilings, trunking, conduit, walls or ducts |
| Rack and patch panel | Where cables terminate |
| Testing | Certification and labelling |
| Building | New build or existing; access and finishes |
02Get an accurate quote
- 01Count pointsList where cables must reach.
- 02Share plansFloor plans or photos.
- 03SurveyWe walk routes and rack locations.
- 04QuoteItemised materials and labour.
- 05Install and testCertified, labelled and documented.
03Request a quote
Learn the basics in structured cabling explained and Cat5e vs Cat6 vs Cat6A.
04Frequently asked questions
Is Cat6 worth it over Cat5e?
For new work, Cat6 is a sensible standard; see our comparison.
Can you cable an existing building?
Yes; we plan routes that limit disruption.
Do you test the cables?
Yes; we test and label every run.